McColl-O'Donnell Drain Supply and Install
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Dodge
Scope of Work: Brushing & Tree Removal Removals of Existing Culverts and Catchbasins Supply and Install 825mm dia. Concrete Tile Supply and Install 825mm dia. Concrete Tile (2000D) Supply and Install 3 x Catchbasins Supply and Install 600mm and 900mm HDPE pipe under Uttoexter Road by Open Cut
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Wyoming, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about McColl-O'Donnell Drain Supply and Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work: Brushing & Tree Removal Removals of Existing Culverts and Catchbasins Supply and Install 825mm dia. Concrete Tile Supply and Install 825mm dia. Concrete Tile (2000D) Supply and Install 3 x Catchbasins Supply and Install 600mm and 900mm HDPE pipe under Uttoexter Road by Open Cut |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Wyoming |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
