McCurdy Avenue Sidewalks
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Clearing And Grubbing, 1,042 Cy Of Borrow Excavation, 150 Tons Of Borrow Excavation Underwater Embankment, 129 Cy Of Foundation Backfill, 309 Tons Of Crushed Aggregate, 52 Tons Superpave Bituminous Concrete Wearing Surface, Patching, 448 Lf Of Roadway And Side Drain Pipe (Class 3 R.c.), 50 Lf Of Trench Drain, 1 Ls Mobilization, 1,569 Sy Of Concrete Sidewalk, 4 Thick, 478 Sy Of Concrete Driveway, 6
- Status
- Closed
- Sector
- Cement, Road, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment
- Location
- Rainsville, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about McCurdy Avenue Sidewalks
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Clearing And Grubbing, 1,042 Cy Of Borrow Excavation, 150 Tons Of Borrow Excavation Underwater Embankment, 129 Cy Of Foundation Backfill, 309 Tons Of Crushed Aggregate, 52 Tons Superpave Bituminous Concrete Wearing Surface, Patching, 448 Lf Of Roadway And Side Drain Pipe (Class 3 R.c.), 50 Lf Of Trench Drain, 1 Ls Mobilization, 1,569 Sy Of Concrete Sidewalk, 4 Thick, 478 Sy Of Concrete Driveway, 6 Thick, 12 Each Roadway And Side Drain Pipe End Treatments, 1 Each Junction Box, Type 1 (Modified... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Rainsville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Automotive, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
