logo
ProjectBid Results

McDade Well Construction

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The Project consists of the following major components: The construction of a new production well, chemical treatment building, and pre-fabricated electrical building on the McDade site. Associated site improvements, structural and architectural components, piping, electrical infrastructure, and instrumentation. Control panel modifications at the Waugh Well site for the VFD/ well pump LCP.

Status
Closed
Sector
Chemical (Industrial), Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Road, Manufacturing (Industrial), Commercial, Government
Location
Pike Road, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about McDade Well Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “McDade Well Construction” is an infrastructure initiative in the Chemical (Industrial) sector, located in Pike Road, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the following major components: The construction of a new production well, chemical treatment building, and pre-fabricated electrical building on the McDade site. Associated site improvements, structural and architectural components, piping, electrical infrastructure, and instrumentation. Control panel modifications at the Waugh Well site for the VFD/ well pump LCP.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Pike Road

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Road, Manufacturing (Industrial), Commercial, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project