McDermitt Lithium Project Drilling Program
Completed · Nevada · Last reported Dec 2025
Source: Investing News Network
The 2025 drilling program at the McDermitt Lithium Project involved the successful completion of a large diameter core drilling program comprising 5 PQ3 core holes to obtain samples for metallurgical testwork to optimize lithium recoveries and unlock value from magnesium. The drilling also provided geological and geotechnical data, with all drill sites rehabilitated and samples prepared for assay.
- Status
- Closed
- Sector
- Mining
- Location
- McDermitt, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Investing News Network
ConstructChat
Ask ConstructChat about McDermitt Lithium Project Drilling Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2025 drilling program at the McDermitt Lithium Project involved the successful completion of a large diameter core drilling program comprising 5 PQ3 core holes to obtain samples for metallurgical testwork to optimize lithium recoveries and unlock value from magnesium. The drilling also provided geological and geotechnical data, with all drill sites rehabilitated and samples prepared for assay. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Nevada |
City | McDermitt |
Source
Source | Investing News Network |
URL |
More Details
Record type | Project |
Article published date | 2025-12-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
