logo

McDermott and Eunice Energy Group to collaborate on Greece-Africa power interconnection

Sector: Advanced Electronics • Location: Italy

Source: Energy Projects & Technology

Project

McDermott and Eunice Energy Group announce the signing of a memorandum of understanding (MoU) for cooperation on the two-gigawatt (2 GW) electrical interconnection between Greece and Egypt, known as the Greece-Africa Power (GAP) Interconnector project.  Eunice Energy Group is leading the transnational consortium between Greece and Egypt for the GAP project, which aims to contribute to regional ene

Project Information FAQ

Project Information

3 Q
The project “McDermott and Eunice Energy Group to collaborate on Greece-Africa power interconnection” is an infrastructure initiative in the Advanced Electronics sector, located in Italy. Taiyo aggregates data on it from Energy Projects & Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

McDermott and Eunice Energy Group announce the signing of a memorandum of understanding (MoU) for cooperation on the two-gigawatt (2 GW) electrical interconnection between Greece and Egypt, known as the Greece-Africa Power (GAP) Interconnector project.  Eunice Energy Group is leading the transnational consortium between Greece and Egypt for the GAP project, which aims to contribute to regional energy security and stability by facilitating intercontinental clean energy transfer. As part of the consortium, McDermott, a leader in engineering, procurement, construction and installation (EPCI) for subsea and deepwater, will be providing engineering and construction guidance for the project. American foreign policy is aligned with the strategic energy objectives of Greece, and GAP represents a project within the national interests of both countries. “This is an MOU of strategic importance at a time when Europe is working to ensure energy security,” said Michael McKelvy, McDermott President and CEO. “I am proud to join forces with Eunice Energy Group on the GAP project and help build the future of energy in the region.” George Kalavrouziotis, Eunice Energy Group CEO, added: “Eunice is thrilled to partner with an American industry leader like McDermott. The GAP Project is the leading electrical interconnection project in the East Mediterranean region, being at the top of the list in terms of technical feasibility and regulatory approval. The 2 GW interconnector will help Egypt export its surplus power to Europe and enable Greece to export its domestically produced green energy into the Balkans and Italy, thus contributing to Europe’s energy independence from Russia’s energy resources.” Source: https://www.mcdermott.com/Image source: Courtesy of Eunice Energy Group Read more Subsea news here

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data