logo

MCDONOUGH PKWY EXT FM JONESBORO RD TO SR 42/US 23 PH 1-GRTA

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project comprises the McDonough Parkway extension from the intersection of the existing McDonough Parkway with Jonesboro Road continuing northeasterly on new location to U.S. 23/S.R. 42. The length of the proposed extension is 1.2 miles. This project will complete a connection of S.R. 20/81 west of McDonough to S.R. 42 north of McDonough with traffic on S.R.20/81 or Jonesboro Road. This proj

Status
Under Construction
Sector
Bridge, Rail, Road, Government
Location
McDonough, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about MCDONOUGH PKWY EXT FM JONESBORO RD TO SR 42/US 23 PH 1-GRTA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MCDONOUGH PKWY EXT FM JONESBORO RD TO SR 42/US 23 PH 1-GRTA” is an infrastructure initiative in the Bridge sector, located in McDonough, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project comprises the McDonough Parkway extension from the intersection of the existing McDonough Parkway with Jonesboro Road continuing northeasterly on new location to U.S. 23/S.R. 42. The length of the proposed extension is 1.2 miles. This project will complete a connection of S.R. 20/81 west of McDonough to S.R. 42 north of McDonough with traffic on S.R.20/81 or Jonesboro Road. This project, in conjunction with the existing McDonough Parkway, will provide a west bypass of McDonough. McDonough Parkway Extension will taper from the current 3 lanes at the existing McDonough Parkway to 2 lanes and maintain 2 lanes for approximately 4000 feet. Just prior to intersecting Ivey Edwards Lane, it tapers back to 3 lanes. From its intersection with Ivey Edwards Lane to the end of the project at U.S.23 /S.R. 42, it will become a four lane divided roadway with a 20 foot wide raised median. A bridge will be constructed over Norfolk Southern Railroad. The speed design will be 35 mph.

Location

Country

United States of America (USA)

State

Georgia

City

McDonough

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Rail, Road, Government

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project