logo
ProjectCompleted

McEwing Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The project will replace the one-lane McEwing Bridge over Mill Creek with a new, two-lane 52.4 metre structure, and reconstruct 157.6 metres of roadway approaching the bridge in Saugeen Shores, Ontario. The project will remove the existing bridge and replace it with a new structure that includes parapet walls, approach slabs, a concrete deck on steel girders, railings, a guide rail and barrier sys

Status
Closed
Sector
Cement, Steel, Road, Power Generation (CCGT), Rail, Bridge, Metal, Government, Manufacturing (Industrial)
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about McEwing Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “McEwing Bridge Replacement” is an infrastructure initiative in the Cement sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will replace the one-lane McEwing Bridge over Mill Creek with a new, two-lane 52.4 metre structure, and reconstruct 157.6 metres of roadway approaching the bridge in Saugeen Shores, Ontario. The project will remove the existing bridge and replace it with a new structure that includes parapet walls, approach slabs, a concrete deck on steel girders, railings, a guide rail and barrier system. The approaches to the bridge will be reconstructed in both directions with wider lanes and shoulders with retaining walls added to accommodate the change in grade. The project will result in a safer and more reliable bridge that will allow the crossing to re-open seeing that it has been closed due to its deteriorating condition. The new structure will provide a secondary route through the community, which will be especially useful for Bruce Power employees and suppliers when Highway 21 is closed due to blowing snow. Farmers will also be able access fields on either side of Mill Creek more easily. In addition, the project will reduce operation and maintenance costs, extend the life of the asset and accommodate both drivers and cyclists.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Steel, Road, Power Generation (CCGT), Rail, Bridge, Metal, Government, Manufacturing (Industrial)

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project