Mcfarland Heavy Site Preparation
Bidding · California · Last reported Jun 2025
Source: Dodge
The objective of this project is to secure services for heavy site preparation on recent burned Federal land which would reduce hazardous fuels with the threat of catastrophic wildfire within the Wildland Urban Interface by accomplishing the following: 1) Treat hazardous fuels conditions that support high severity reburn by felling dead trees and Construct control lines around units or piles. 2) R
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial
- Location
- Redding, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mcfarland Heavy Site Preparation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of this project is to secure services for heavy site preparation on recent burned Federal land which would reduce hazardous fuels with the threat of catastrophic wildfire within the Wildland Urban Interface by accomplishing the following: 1) Treat hazardous fuels conditions that support high severity reburn by felling dead trees and Construct control lines around units or piles. 2) Re-establish forested conditions by preparing the site for planting seedlings 3) Remove undesirabl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Redding |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
