McIntyre Traffic Calming
Sector: Cement • Location: Yukon, Canada
Source: Infrastructure Canada
"McIntyre Drive Traffic Calming Project will transform the neighbourhood corridor into a safe, multi-modal transportation showpiece, complementing the evolution of the adjacent Kwanlin Dün First Nation (KDFN) land uses. The road corridor is owned and operated by the City of Whitehorse, and is located fully within KDFN settlement land. The key components of the draft design include enlarged curb ex
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | "McIntyre Drive Traffic Calming Project will transform the neighbourhood corridor into a safe, multi-modal transportation showpiece, complementing the evolution of the adjacent Kwanlin Dün First Nation (KDFN) land uses. The road corridor is owned and operated by the City of Whitehorse, and is located fully within KDFN settlement land. The key components of the draft design include enlarged curb extensions at select intersections to narrow the driving right of way and reduce pedestrian crossing distances, curb extensions to provide transit stop facilities and improve transit accessibility, new zebra pavement markings at key crossing locations, 1.2 km of new protected cycle lanes (1.2 km on each side of the roadway) with marked cross-rides at intersections and accesses, installation of 50 concrete wheelchair and bike ramps, and 1.2 km of new sidewalk with barrier curb to increase pedestrian connectivity and safety. A lighting evaluation and design will improve illumination within the corridor." |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
