logo

McKay Bay Waste-to-Energy Plant Upgrades

One of 10,000+ projects Taiyo tracks in Florida.

Source: Industrial Info Resources

Project
Planned

Upgrades to Boiler No. 3, Boiler No. 4, and control systems at the existing McKay Bay Waste-to-Energy Plant in Tampa, Florida. Boiler No. 3 upgrades could begin in 2026, Boiler No. 4 in 2027, and control systems in 2028.

Status
Prospective
Sector
Manufacturing (Industrial), Power Generation (CCGT)
Location
Tampa, Florida, United States of America
Updated
22 Jul 2026
Source
Industrial Info Resources

ConstructChat

Ask ConstructChat about McKay Bay Waste-to-Energy Plant Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “McKay Bay Waste-to-Energy Plant Upgrades” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tampa, Florida, United States. Taiyo aggregates data on it from Industrial Info Resources.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Upgrades to Boiler No. 3, Boiler No. 4, and control systems at the existing McKay Bay Waste-to-Energy Plant in Tampa, Florida. Boiler No. 3 upgrades could begin in 2026, Boiler No. 4 in 2027, and control systems in 2028.

Original sector

Power

Location

Country

United States of America (USA)

State

Florida

City

Tampa

Source

Source

Industrial Info Resources

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2026-07-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project