McLaughlin Wind Aggregated Generating Facility Connection
Sector: Broadband • Location: Pincher Creek, Alberta, Canada
Source: Dodge USA
Connection of McLaughlin Wind Farm to electric system - 20 metres (65 feet) of new transmission line - Modification of existing transmissionline - Installation of fibre optic cable
- Status
- Closed
- Sector
- Broadband, Wind, Power Generation (CCGT), Power Transmission, Raw Materials, Telecommunications, Commercial
- Location
- Pincher Creek, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about McLaughlin Wind Aggregated Generating Facility Connection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Connection of McLaughlin Wind Farm to electric system - 20 metres (65 feet) of new transmission line - Modification of existing transmissionline - Installation of fibre optic cable |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Pincher Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Wind, Power Generation (CCGT), Power Transmission, Raw Materials, Telecommunications, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
