MCMUD No. 113 Wastewater Treatment Plant Phase IV
Sector: Waste Processing and Treatment • Location: Conroe, Texas, United States of America
Source: Dodge USA
Scope of Project: Provide materials, equipment, and labor to expand existing WWTP to 1.30 MGD capacity. Work to include one (1) permanent aeration basin with entrance and exit channels, one (1) multi-stage centrifugal blower, fine bubble diffuser equipment, six (6) disk filters, one (1) backwash pump, one (1) canopy over the chlorine storage, modifications to chlorine equipment, one (1) dechlorina
- Status
- Closed
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Water Supply and Storage, Government, Commercial
- Location
- Conroe, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MCMUD No. 113 Wastewater Treatment Plant Phase IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Project: Provide materials, equipment, and labor to expand existing WWTP to 1.30 MGD capacity. Work to include one (1) permanent aeration basin with entrance and exit channels, one (1) multi-stage centrifugal blower, fine bubble diffuser equipment, six (6) disk filters, one (1) backwash pump, one (1) canopy over the chlorine storage, modifications to chlorine equipment, one (1) dechlorination containment structure with foundation and canopy, dechlorination equipment, electrical impro... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Conroe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Water Supply and Storage, Government, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
