MCS Agri
Sector: Raw Materials • Location: Mongolia
Source: International Finance Corporation (IFC)
The proposed IFC investment is corporate loan of up to US$60m to MCS Group with specific use of proceeds for the (i) construction of a 24-storey commercial building in central Ulaanbaatar (known as ICC Tower) and (ii) agricultural and meat production operations at Metagro (a fully owned subsidiary of MCS), including existing farm, cattle feedlot, and slaughterhouse/meat processing/packing facility
- Status
- Prospective
- Sector
- Raw Materials, Water Supply and Storage, Hotel, Government, Warehouse, Commercial
- Location
- Mongolia
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about MCS Agri
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed IFC investment is corporate loan of up to US$60m to MCS Group with specific use of proceeds for the (i) construction of a 24-storey commercial building in central Ulaanbaatar (known as ICC Tower) and (ii) agricultural and meat production operations at Metagro (a fully owned subsidiary of MCS), including existing farm, cattle feedlot, and slaughterhouse/meat processing/packing facility (the “Project”). The investment to Metagro will be the first IFC investment in the agriculture sector in Mongolia. Metagro’s operational footprint includes (i) 10,200ha of arable land divided in three plots (field 1, 2 and 3) of 4,000 ha; 4,000ha and 2,200ha, including 100ha of irrigated (central pivot irrigation) with a proposed expansion to 400ha; (ii) 50ha cattle feedlot, hay storage, feed silo, feed mixing areas, slaughterhouse/meat processing/packing facility of 10,000 to 15,000 cattle heads per year capacity that includes an on-site wastewater treatment (WWT) plant and a rendering plant next to the cattle feedlot; (iii) homesteads, greenhouses, irrigation pond, grain silos and maintenance workshop area. The farm, cattle feedlot, slaughterhouse/meat processing/packing, and all ancillary facilities are located in the Chandgana valley, Kherlen soum/district, Khentii province situated 330 km east from Ulaanbaatar. This would be IFC’s sixth investments in MCS. Previous investments are available at: https://disclosures.ifc.org/project-detail/ESRS/44118/mcs-covid; https://disclosures.ifc.org/project-detail/ESRS/33808/intermed; https://disclosures.ifc.org/project-detail/ESRS/31669/mcs-property; https://disclosures.ifc.org/project-detail/ESRS/28546/shangri-la-ulaanbaatar-hotel-llc; https://disclosures.ifc.org/project-detail/ESRS/25170/mcs-group). The E&S performance of MCS’s past projects and those still in IFC’s portfolio has been satisfactory. |
Original sector | A-AG - Diversified Edible Agricultural Crops Production |
Location
Country | Mongolia |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Hotel, Government, Warehouse, Commercial |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
