MCSD EV Bus Charging Station - Design/Build
Sector: Automotive • Location: Merced, California, United States of America
Source: Dodge USA
Inclusive of: demolition of existing bus parking lot, earthwork grading, site electrical, ev charger, installation, site concrete, asphalt paving and striping to make a new parking lot for bus parking with (15) new ev charging stations. The ev charger equipment was purchased by the district and is to be installed under the f&h scope. Pg&e will install the main feeder and transformer. Connections t
- Status
- Closed
- Sector
- Automotive, Electric Vehicles (EVs), Warehouse, Cement, Power Generation (CCGT), Road, Commercial, Car parking, Government, Manufacturing (Industrial)
- Location
- Merced, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MCSD EV Bus Charging Station - Design/Build
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Inclusive of: demolition of existing bus parking lot, earthwork grading, site electrical, ev charger, installation, site concrete, asphalt paving and striping to make a new parking lot for bus parking with (15) new ev charging stations. The ev charger equipment was purchased by the district and is to be installed under the f&h scope. Pg&e will install the main feeder and transformer. Connections to the transformer are under the f&h scope. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Merced |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Warehouse, Cement, Power Generation (CCGT), Road, Commercial, Car parking, Government, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
