logo

MCUD Well Field and Water Treatment Facility

Sector: Water Supply and Storage • Location: Midland, Texas, United States of America

Source: Dodge

Project
Closed

Project Includes well field is planned to consist of 7 to 9 wells approximately 200 feet deep, above ground piping and appurtenances, electrical, pumping equipment, access roads, approximately 15,500 linear feet of collection, transmission piping ranging in size from 6 to 20 inches and appurtenances, back up generation and full Supervisory Control And Data (SCADA) System and Water Treatment facili

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT), Road, Commercial
Location
Midland, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about MCUD Well Field and Water Treatment Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MCUD Well Field and Water Treatment Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in Midland, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Includes well field is planned to consist of 7 to 9 wells approximately 200 feet deep, above ground piping and appurtenances, electrical, pumping equipment, access roads, approximately 15,500 linear feet of collection, transmission piping ranging in size from 6 to 20 inches and appurtenances, back up generation and full Supervisory Control And Data (SCADA) System and Water Treatment facility is currently planned to produce 1.0 MGD of treated water by reverse osmosis and will generally...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Midland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT), Road, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project