MD/DOT: Bridge Replacement
Sector: Water Supply and Storage • Location: Upper Marlboro, Maryland, United States of America
Source: Dodge
The Maryland Department of Transportation s State Highway Administration (SHA) has initiated a project, MD 4 (Stephanie Roper Highway) Bridges over MD 717 (Water Street) and Marlboro Race Track Road in Upper Marlboro (PG2585180). This project will include full bridge replacements for the MD 4 eastbound and westbound bridges over Marlboro Race Track Road, and bridge substructure (supports) rehabili
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Maryland Department of Transportation s State Highway Administration (SHA) has initiated a project, MD 4 (Stephanie Roper Highway) Bridges over MD 717 (Water Street) and Marlboro Race Track Road in Upper Marlboro (PG2585180). This project will include full bridge replacements for the MD 4 eastbound and westbound bridges over Marlboro Race Track Road, and bridge substructure (supports) rehabilitation, deck replacements and widening for the bridges on MD 4 eastbound and westbound over MD 71... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
