MD/DOT: US 40 Bridge Rehabilitation
Sector: Car parking • Location: Hagerstown, Maryland, United States of America
Source: Dodge
Rehabilitation for Bridge No. 2101200 on US 40 over Conococheague Creek. The existing 5 span concrete arch bridge has span lengths of 54 , 102 , 97 , 84 , and 35 for a length of 372 , with a proposed clear roadway of 38 . Project includes removal and replacement of the concrete bridge deck, parapets and sidewalks, supporting floor beams, and spandrel columns. In addition, the existing concrete arc
- Status
- Closed
- Sector
- Car parking, Commercial, Automotive, Bridge, Cement, Road, Manufacturing (Industrial)
- Location
- Hagerstown, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MD/DOT: US 40 Bridge Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rehabilitation for Bridge No. 2101200 on US 40 over Conococheague Creek. The existing 5 span concrete arch bridge has span lengths of 54 , 102 , 97 , 84 , and 35 for a length of 372 , with a proposed clear roadway of 38 . Project includes removal and replacement of the concrete bridge deck, parapets and sidewalks, supporting floor beams, and spandrel columns. In addition, the existing concrete arches, abutments, and piers will be rehabilitated. Project includes, 0.10 miles of approach roadway... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Hagerstown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Automotive, Bridge, Cement, Road, Manufacturing (Industrial) |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
