Meade Street Water Main Reconstruction
Sector: Water Supply and Storage • Location: Rapid City, South Dakota, United States of America
Source: Dodge USA
This project includes the replacement of approximately 1,300 lineal feet of water main in Meade Street from 7th Street to 5th Street and in 6th Street from Flormann Street to Meade Street. The existing 6 inch water main has reached the end of its useful life and needs to be replaced.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Rapid City, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Meade Street Water Main Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the replacement of approximately 1,300 lineal feet of water main in Meade Street from 7th Street to 5th Street and in 6th Street from Flormann Street to Meade Street. The existing 6 inch water main has reached the end of its useful life and needs to be replaced. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Rapid City |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
