Meadow Crescent Flood Mitigation Berm
Sector: Water Supply and Storage • Location: Sussex, New Brunswick, Canada
Source: Dodge
The work generally consists of erosion and sediment control, 15,760 m3 of excavation, 216 m of new storm sewer with structures, 215 m of subdrain with structures, importing 12,040 m3 of borrow fill and 3,255 m3 of low-permeability fill for berm construction, 2,150 tonnes of riprap, 3,990 m3 of granular material for access road construction, landscaping and site restoration.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Sussex, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Meadow Crescent Flood Mitigation Berm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally consists of erosion and sediment control, 15,760 m3 of excavation, 216 m of new storm sewer with structures, 215 m of subdrain with structures, importing 12,040 m3 of borrow fill and 3,255 m3 of low-permeability fill for berm construction, 2,150 tonnes of riprap, 3,990 m3 of granular material for access road construction, landscaping and site restoration. |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Sussex |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
