Meadowcrest Sidewalk
Sector: Power Transmission • Location: Upper Saint Clair, Pennsylvania, United States of America
Source: Dodge USA
Meadowcrest Sidewalk The project involves the installation of new concrete sidewalk and ADA ramps along Meadowcrest Drive, including, but not limited to, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident notification; erosion and sedimentation control measures; bulk excavation and fine grading; infiltration trench installation; placement of new concrete
- Status
- Prospective
- Sector
- Power Transmission, Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Commercial
- Location
- Upper Saint Clair, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Meadowcrest Sidewalk
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding, Pre-Qualification |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Meadowcrest Sidewalk The project involves the installation of new concrete sidewalk and ADA ramps along Meadowcrest Drive, including, but not limited to, clearing and grubbing; miscellaneous site removals and replacements; traffic control; resident notification; erosion and sedimentation control measures; bulk excavation and fine grading; infiltration trench installation; placement of new concrete curb sidewalk and handicap ramps; existing driveway and sidewalk adjustments; existing utility a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Upper Saint Clair |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
