logo
ProjectCompleted

Meander River Essential Power Upgrade Project

Completed · Alberta

Source: Infrastructure Canada

The Project will replace the single-phase radial circuit power line with a three-phase overhead power from High Level to Meander River.

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Alberta, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Meander River Essential Power Upgrade Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Meander River Essential Power Upgrade Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Alberta, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project will replace the single-phase radial circuit power line with a three-phase overhead power from High Level to Meander River.

Original sector

Green Energy

Location

Country

Canada

State

Alberta

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project