MEB Port
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
In 1992 Terminal Marítimo Muelles el Bosque S.A. (MEB) began executing a 20-year concession (extended in 2005 for another 20 years until 2032) to develop and manage a new multipurpose port in the Bay of Cartagena, on Colombia’s Atlantic coast. Muelles el Bosque Operadores Portuarios S.A. (MBO and together with MEB the company), a sister company to MEB, is the operator of the port facility. The po
- Status
- Closed
- Sector
- Seaport, Water Supply and Storage, Consumer Products, Government, Manufacturing (Industrial), Residential, Commercial
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about MEB Port
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 1992 Terminal Marítimo Muelles el Bosque S.A. (MEB) began executing a 20-year concession (extended in 2005 for another 20 years until 2032) to develop and manage a new multipurpose port in the Bay of Cartagena, on Colombia’s Atlantic coast. Muelles el Bosque Operadores Portuarios S.A. (MBO and together with MEB the company), a sister company to MEB, is the operator of the port facility. The port occupies and area of 13 hectares and is the second largest in the city of Cartagena and the fifth largest in Colombia. In 2006 it received 438 ships and handled 46,278 containers, 253,179 tons of general cargo, 412,714 tons of grains and 52,760 tons of coke (fuel). The Port is located in an industrial and commercial zone next to the residential area of El Bosque. The proposed project includes:- the extension of the south container terminal berth by 180 meters;- the expansion of the container yard by 3.2 hectares and the paving of the existing container yard;- the acquisition of an additional mobile crane and other container yard equipment;- the extension of the north berth by 50 meters; - the building of two additional warehouses/silos;- purchase of land to increase container storage space; and - the upgrade of the port’s IT systems. |
Original sector | BB - Port and Harbor Operations |
Procurement method |
Location
Country | Colombia |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Seaport, Water Supply and Storage, Consumer Products, Government, Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
