Medical Devices Reprocessing Upgrades Remote/Rural Bundle 6
Sector: Hospital • Location: Alberta, Canada
Source: Infrastructure Canada
The Medical Devices Reprocessing Upgrades Remote/Rural Bundle 6 Project (the Project) consist of medical device reprocessing upgrades, architectural drawings and heating, ventilation, and air conditioning systems drawings/renovations in the following locations: Lac La Biche Healthcare Centre, Lac La Biche: Construction of new walls to provide separation of clean and sterile areas as well as proces
- Status
- Under Construction
- Sector
- Hospital, Power Transmission, Power Generation (CCGT)
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Medical Devices Reprocessing Upgrades Remote/Rural Bundle 6
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Medical Devices Reprocessing Upgrades Remote/Rural Bundle 6 Project (the Project) consist of medical device reprocessing upgrades, architectural drawings and heating, ventilation, and air conditioning systems drawings/renovations in the following locations: Lac La Biche Healthcare Centre, Lac La Biche: Construction of new walls to provide separation of clean and sterile areas as well as process flow changes to reduce cross over circulation to reduce contamination of reprocessed equipment; reallocation and renovation of adjacent, shared space for laundry, housekeeping and circulation usage; installation of new, built-in equipment including but not limited to washers, disinfectors, cart washers; sterilizers; endoscope re-processors, and an Ultrasound Probe Disinfector. Bonnyville Healthcare Centre, Bonnyville: Renovation and interior expansion of existing space by 40 square metre; installation of hands-free sinks in soiled utility rooms; renovation in the decontamination area to include a separation from the clean laundry area; construction of a new area to reprocess the Gastrointestinal Endoscopes and Ultrasound Probes in on the clean side; installation of new, built-in equipment including but not limited to: washers and sanitizers, an Ultrasound Probe Disinfector, and Sterilizer. McLennan Healthcare Centre, McLennan: Renovation and interior expansion of a existing space by 50 square metre; installation of washer/sanitizers in soiled utility rooms; construction of a separate room proper separation in the assembly and clean storage area and installation of a cart washer; and installation of new equipment items including but not limited to: washers, sanitizers, a disinfector and a cart washer. |
Original sector | Ventilation Systems |
Location
Country | Canada |
State | Alberta |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hospital, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
