logo

Medio Creek WRC Standby Generator Replacement

Sector: Commercial • Location: San Antonio, Texas, United States of America

Source: Dodge USA

Project
Bid Results

San Antonio Water System for the demolition of the existing 2000 kW standby diesel generator and replacement with two new parallel 1250 kW diesel standby generators; installation of a new electrical building, generator switchboard, load bank, building pad, and generator pads; coordination with the early procurement contract which procured the generators, switchboard, load bank, and other ancillary

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Hospital, Hotel
Location
San Antonio, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Medio Creek WRC Standby Generator Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Medio Creek WRC Standby Generator Replacement” is an infrastructure initiative in the Commercial sector, located in San Antonio, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

San Antonio Water System for the demolition of the existing 2000 kW standby diesel generator and replacement with two new parallel 1250 kW diesel standby generators; installation of a new electrical building, generator switchboard, load bank, building pad, and generator pads; coordination with the early procurement contract which procured the generators, switchboard, load bank, and other ancillary equipment; accepting receipt and delivery of the early procured equipment and installation there...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

San Antonio

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Hospital, Hotel

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project