MEDIUM CITIES URBAN TRANSPORT PROJECT
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The main objectives of the project are to improve the quality and efficiency of urban transport systems in medium-size cities, assist the Federal Government in decentralizing responsibility for urban transport management and finance improvements that are economically justified, and control the environmental impacts of urban transport operations. The project comprises national and local components
- Status
- Closed
- Sector
- Road, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MEDIUM CITIES URBAN TRANSPORT PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the project are to improve the quality and efficiency of urban transport systems in medium-size cities, assist the Federal Government in decentralizing responsibility for urban transport management and finance improvements that are economically justified, and control the environmental impacts of urban transport operations. The project comprises national and local components. The national component comprises: (a) an institutional strengthening program for the Ministry of Social Development; (b) an institutional strengthening program for the National Development Bank for Public Works and Services; (c) a national training program for urban transport professionals; and (d) grants towards the cost of studies to prepare Integral Transport Plans (ITPs). The local component comprises sub-loans to medium-size cities that meet eligibility criteria to finance: (a) the remaining cost of the studies for ITPs; (b) urgent infrastructure improvements; (c) other urban transport improvements, including planning and rehabilitation, paving of access routes to low income areas and corridor improvements; (d) the final design of sub-projects, technical assistance, studies and training for professional staff in the cities; and (e) equipment for traffic management and control. |
Original sector | FY17 - Public Administration,FY17 - Transportation |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mexico
- Norte III Combined Cycle Power Plant Chihuahua
- Libramiento de Ciudad Obregon
- Autovia Urbana Norte
- Tuxtla Gutierrez - San Cristobal de las Casas Highway Expansion
- Coatzacoalcos-Villahermosa Highway
- Viaducto Bicentenario (Phase 1)
- La Piedad Bypass and Access to Mexico-Gudalajara Highway
- Rio de los Remedios-Ecatepec urban toll road (Phase I)
