logo

MEDIUM CITIES WATER

Sector: Water Supply and Storage • Location: Mexico

Source: World Bank Group

Project
Closed

The Second Medium Size Cities Water Supply and Sewerage Project will extend water supply services to about 1.2 million people and sewerage services to nearly 1.3 million in several medium size cities. Water production facilities and sewer interceptors and outfalls have been designed to provide a water supply coverage of 90 percent and a sewerage coverage of 80 percent to the population of these ci

Project Information FAQ

Project Information

5 Q
The project “MEDIUM CITIES WATER” is an infrastructure initiative in the Water Supply and Storage sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Medium Size Cities Water Supply and Sewerage Project will extend water supply services to about 1.2 million people and sewerage services to nearly 1.3 million in several medium size cities. Water production facilities and sewer interceptors and outfalls have been designed to provide a water supply coverage of 90 percent and a sewerage coverage of 80 percent to the population of these cities by 1995. The project will include construction of sewage treatment plants, where necessary, to keep the pollution level of effluents within acceptable standards. It will promote metering of house connections and will include leak detection and control programs. A technical assistance program to the local water and sewerage companies will help improve the operational and service capabilities of these institutions. About 36 percent of the additional population to be served with water supply and 34 percent of the additional population to be served with sewerage are expected to be urban poor consumers, whose incomes are lower than one-third of the national per capita income. The construction of the works faces no special risks. There is a possibility of delays in the achievement of improved managerial and financial performance of the beneficiary companies. These risks are considered acceptable.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data