Medusa Submarine Cable
Sector: Telecommunications • Location: Nador, Oriental, Morocco
Source: L'Economiste
The Medusa submarine cable is a major telecom infrastructure project connecting Europe, Morocco, and Africa. It is the largest high-capacity fiber optic submarine cable system in the Mediterranean, stretching over 8,700 km and connecting 12 countries with 18 landing points. The cable has a total capacity of 20 Tbps and aims to strengthen digital exchanges and resilience between Europe and Africa.
- Status
- Under Construction
- Sector
- Telecommunications, Broadband, Warehouse
- Location
- Nador, Oriental, Morocco
- Updated
- 22 Jul 2026
- Source
- L'Economiste
ConstructChat
Ask ConstructChat about Medusa Submarine Cable
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Medusa submarine cable is a major telecom infrastructure project connecting Europe, Morocco, and Africa. It is the largest high-capacity fiber optic submarine cable system in the Mediterranean, stretching over 8,700 km and connecting 12 countries with 18 landing points. The cable has a total capacity of 20 Tbps and aims to strengthen digital exchanges and resilience between Europe and Africa. The cable landed at Arkman beach near Nador, Morocco, on December 16, 2025, and is expected to be operational by February 2026. Orange Morocco designed and built a Cable Landing Station (CLS) to accommodate the cable, which is a state-of-the-art infrastructure covering 3,500 m² with scalable international connectivity. |
Original sector | Telecommunications |
Location
Country | Morocco |
State | Oriental |
City | Nador |
Source
Source | L'Economiste |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Broadband, Warehouse |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
