Meenakshi Energy Private Limited

Sector: Geothermal • Location: India

Source: World Bank Group

Project
Active

The Krishnapatnam Thermal Power Project was a 540 MW coal based thermal power plant located at Krishnapatnam port in Thamenapattanam Village in Nellore District in Andhra Pradesh. The project was initially planned as a 250 MW plant. However, the scope was later revised to develop a 540 MW power project on a Build-Own-Operate (BOO) basis. The project was to be implemented in two phases, each with a

Project Information FAQ

Project Information

4 Q
The project “Meenakshi Energy Private Limited” is an infrastructure initiative in the Geothermal sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Krishnapatnam Thermal Power Project was a 540 MW coal based thermal power plant located at Krishnapatnam port in Thamenapattanam Village in Nellore District in Andhra Pradesh. The project was initially planned as a 250 MW plant. However, the scope was later revised to develop a 540 MW power project on a Build-Own-Operate (BOO) basis. The project was to be implemented in two phases, each with a capacity of 2x135 MW. The project was being developed by Meenakshi Energy Private Limited (MEPL), a part of the Meenakshi Group, following direct negotiations with the Government of Andhra Pradesh. MEPL signed a Memorandum of Understanding with Power Trading Corporation India Limited (PTC), a power trading company, for the sale of entire power from this project for a period of 25 years. The project was estimated to cost US $670 million. Financial closure for the project was achieve in June 2008 with a debt equity ratio of 75/25. Construction work started in July 2009 and concluded in December 2010. The project was expected to be completed by December 2010. http://meenakshigroup.net/html/power_projects.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data