Meerut Muzaffarnagar Road Project

Sector: Mass Transit • Location: India

Source: World Bank Group

Project
Active

National Highways Authority of India (NHAI) awarded a 20 year concession to Western UP Tollway Limited (WUTL) to upgrade, finance, operate and maintain the 78.31 km section on National Highway 58 (NH-58) between Meerut and Muzaffarnagar, in Uttar Pradesh State. The project included four-laning of the existing two lane stretch; construction of three railway overbridges, one flyover, two major bridg

Project Information FAQ

Project Information

4 Q
The project “Meerut Muzaffarnagar Road Project” is an infrastructure initiative in the Mass Transit sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

National Highways Authority of India (NHAI) awarded a 20 year concession to Western UP Tollway Limited (WUTL) to upgrade, finance, operate and maintain the 78.31 km section on National Highway 58 (NH-58) between Meerut and Muzaffarnagar, in Uttar Pradesh State. The project included four-laning of the existing two lane stretch; construction of three railway overbridges, one flyover, two major bridges, seven underpasses, service roads, four truck laybys and one rest area on Khatauli bypass. The concession term included the construction period of 36 months. The concession agreement between NHAI and WUTL was signed in September 2005. This concession was part of NHAI’s National Highway Development Project (NHDP) Phase III A. The objective of NHDP Phase IIIA was to widen (four lane) sections of national highways carrying high volume of traffic, connecting state capitals with the NHDP Phases I and II network and providing connectivity to places of economic, commercial and tourist importance. WUTL, a special purpose company established to implement this project, was jointly owned by three Indian firms namely - Nagarjuna Construction Company Limited (30%), Maytas Infra Private Limited (30%) and Gayatri Projects Limited (40%). WUTL won the project in an international competitive tender, conducted by NHAI, by bidding for the lowest grant in the amount of US$ 28.2 million. India’s highway development policy allowed ‘viability funding’ by NHAI to the tune of 40 percent of the capital costs as grant to the concessionaire, subject to competitive bidding. The total capital cost of the project was estimated at US$ 79.5 million. The project reached financial closure in May 2006. The debt was raised by a consortium of banks that included Bank of Baroda, Canara Bank, Syndicate Bank, and Corporation Bank. WUTL was to be compensated for the capital and operating costs from the tolls collected during the concession term. Construction work on the project began in March 2006 and was expected to be completed by March 2009.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data