logo

Meeting 100Gbps Ethernet Requirements with CMOS Integrated Circuit Chipset to Dramatically Cut Energy Use in Data Centres

Sector: Data Center • Location: United Kingdom

Source: EU Funding & Tenders Portal

Project
Ended

"Data centres are critical modern infrastructure, yet their energy consumption is growing unsustainably. Globally, data centres consume 3% of electricity (higher than the UK’s total consumption) and account for 2% of total greenhouse gas emissions. That gives them the same carbon footprint as the airline industry. Although various energy efficiency gains are being made, the state of the art for da

Project Information FAQ

Project Information

3 Q
The project “Meeting 100Gbps Ethernet Requirements with CMOS Integrated Circuit Chipset to Dramatically Cut Energy Use in Data Centres” is an infrastructure initiative in the Data Center sector, located in United Kingdom. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"Data centres are critical modern infrastructure, yet their energy consumption is growing unsustainably. Globally, data centres consume 3% of electricity (higher than the UK’s total consumption) and account for 2% of total greenhouse gas emissions. That gives them the same carbon footprint as the airline industry. Although various energy efficiency gains are being made, the state of the art for data transmission within the data centre is inefficient. Optical Transceiver Modules (OTM), at 40Gbps and above, use power-hungry SiGe/BiCMOS technology in their Integrated Circuits. With a typical, large data centre containing at least 800,000 OTMs, they are responsible for around 8% of total energy use. HiLight Semiconductor Ltd, a “Fabless Chip Company”, has developed MERCURY, an innovative Integrated Circuit chipset, pioneering the use of industry-standard CMOS technology to drive 100Gbps OTMs. With the use of standard CMOS, on 12"" wafers, we are able to produce our Chipset for significantly less than our competitors' BiCMOS on 8"" wafers. Together with our low power innovation, we expect to displace BiCMOS technology entirely over the next few years, just as has been seen previously, at lower datarates. Meeting all industry standards, MERCURY achieves 100Gbps with less than half (57%) the power consumption of BiCMOS solutions. Based on European data centres' energy use and our expected global sales rates, by 2022, MERCURY will save 1.5 Billion kWh every year in Europe and 6 Billion kWh/year globally, helping meet the EC Code of Conduct for Energy Efficiency in Data Centres. This innovation project is designed to undertake vital prototyping, validation and demonstration activities to bring MERCURY to market-readiness. Within five years (2022), we expect to secure 30% of the global market, generating €49.5 million cumulative profits and creating 35 very highly skilled jobs, extending Europe’s leadership as a Centre of Excellence in high speed Analog CMOS design."

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data