Meeting Place Greenway
Sector: Water Supply and Storage • Location: Chambersburg, Pennsylvania, United States of America
Source: Dodge USA
The Meeting Place Greenway Project work entails the removal of approximately 25,000 sq. ft. of an asphalt, concrete and gravel parking lot. Amended topsoil and sod will be installed after removal. The remaining adjacent asphalt will be delineated with a concrete curb to create a boundary between the parking lot and the greenway. Two inoperable light poles and concrete bases will be removed. To pro
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Cement, Government, Automotive
- Location
- Chambersburg, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Meeting Place Greenway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Meeting Place Greenway Project work entails the removal of approximately 25,000 sq. ft. of an asphalt, concrete and gravel parking lot. Amended topsoil and sod will be installed after removal. The remaining adjacent asphalt will be delineated with a concrete curb to create a boundary between the parking lot and the greenway. Two inoperable light poles and concrete bases will be removed. To provide pedestrian connectivity and handicapped access to the greenway, a 12ft. asphalt path will be... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Chambersburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Cement, Government, Automotive |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
