Mega Loop Trail Improvements
Sector: Water Supply and Storage • Location: Elk River, Minnesota, United States of America
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for 2,025 CY Excavation Common (EV) 4,267 CY Topsoil Strip 1,884 CY Aggregate Base C15 1, 783 TON Type SP 9.5 Wearing Course Mix 329 LF 12 54 Storm Pipe 516 CY Riprap Class 3 835 SF 6 Concrete Walk 10,428 LF Silt Fence 5,096 SY Rolled Erosion Prevention CAT 25 4.7 ACRES Seed & Hydromulch
- Status
- Closed
- Sector
- Water Supply and Storage, Electric Vehicles (EVs), Automotive, Rail, Commercial, Cement, Mass Transit, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Government
- Location
- Elk River, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mega Loop Trail Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for 2,025 CY Excavation Common (EV) 4,267 CY Topsoil Strip 1,884 CY Aggregate Base C15 1, 783 TON Type SP 9.5 Wearing Course Mix 329 LF 12 54 Storm Pipe 516 CY Riprap Class 3 835 SF 6 Concrete Walk 10,428 LF Silt Fence 5,096 SY Rolled Erosion Prevention CAT 25 4.7 ACRES Seed & Hydromulch |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Elk River |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Electric Vehicles (EVs), Automotive, Rail, Commercial, Cement, Mass Transit, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
