logo

Meghnaghat II Power Plant

Sector: Natural Gas • Location: Bangladesh

Source: World Bank Group

Project
Active

On November 2010, Summit Power Limited (SPL) a Bangladeshi Independent Power Producer, was signed a Build Own and Operate agreement with Bangladesh Power Development Board (BPDB) for the construction and operation for a 22 years term of a 450 MW, combined cycle (Natural gas) power plant at Meghnaghat. The contractors was a joint venture between Summit Industrial (Bangladesh, 50 %) and Mercantile C

Project Information FAQ

Project Information

4 Q
The project “Meghnaghat II Power Plant” is an infrastructure initiative in the Natural Gas sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On November 2010, Summit Power Limited (SPL) a Bangladeshi Independent Power Producer, was signed a Build Own and Operate agreement with Bangladesh Power Development Board (BPDB) for the construction and operation for a 22 years term of a 450 MW, combined cycle (Natural gas) power plant at Meghnaghat. The contractors was a joint venture between Summit Industrial (Bangladesh, 50 %) and Mercantile Corporation Ltd (China, 50%). The plant will be completed in two phases, the first phase up to 300MW, and a then it will be upgrade of 150MW capacity installation. Under the BOO agreement, SPL was to supply 450 MW of energy to BPDB for a term of 22 years. The remainder of the energy was to be sold to the public. Following a competitive bidding process, SPL was declared the lowest bidder to set up a 450 MW combined cycle power plant at Meghnaghat. The total project cost was 300 US millions. according to BPDB publications The project reached financial closure in January 2012, few months after the signing of the loan agreement. 60 % (180 US millions) of the loan were arranged from capital market by issuing zero coupon bonds under the assistance of Janata Bank Limited and Industrial and Infrastructure Development Finance Company. On December 28, 2012, MIGA issued a guarantee of $221.4 million to Hong Kong Shanghai Banking Corporation (HSBC) of the United Kingdom to cover its non-shareholder loan to Ashuganj Power Station Company Ltd. On March 8, 2013, MIGA issued additional coverage of $30 million covering a swap arrangement to hedge against long-term interest rate risk. MIGA’s guarantees are for a period of up to 13.5 years against the risk of non-honoring of sovereign financial obligations. The Ministry of Finance of Bangladesh has provided an unconditional sovereign guarantee covering payment obligations of APSCL under the debt financing and the swap.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data