Meishan City Pengshan District Water Utilities Project Phase I
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In April 2016, Beijing Jiuan Construction and Investment Group, subsidiary of a local private company, Origin Water signed a Public Private Partnership agreement with the Pengshan District Government to finance, build and operate ten wastewater treatment plants (City West 1000 tons per day; Jiangkou Town East 800 tons per day; Gongyi Town 100 tons per day; Jiangkou Town West 500 tons per day; Jinj
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Power Generation (CCGT)
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Meishan City Pengshan District Water Utilities Project Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 2016, Beijing Jiuan Construction and Investment Group, subsidiary of a local private company, Origin Water signed a Public Private Partnership agreement with the Pengshan District Government to finance, build and operate ten wastewater treatment plants (City West 1000 tons per day; Jiangkou Town East 800 tons per day; Gongyi Town 100 tons per day; Jiangkou Town West 500 tons per day; Jinjiang Village 1000 tons per day; Qinglong District 1500 tons per day; Wuyang 100 tons per day; Baosheng 800 tons per day; Huangfeng 800 tons per day; Yihe 800 tons per day) in Pengshan District, Meishan City, Sichuan Province. The concession term was 30 years. The total investment was US$ 24.08 million (RMB 160 million) and Origin Water had a 90% stake in the project with the remaining 10% belonging to the local government. The total design treatment capacity of the plants was 9200 tons per day. Construction commenced in June 2016. This project was one of the demonstration PPP projects of the Sichuan Province. |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Transmission, Government, Power Generation (CCGT) |
Article published date | 2024-09-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant