logo

Meizhou Wuhua Waste-to-energy Plant Phase I

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project involves the investment, construction and operation of the phase I of Meizhou Wuhua Waste-to-energy plant, located in Wuhua, Guangdong Province, China. The project will be constructed in 2 phases with a total designed daily waste processing capacity of 1,050 tonnes. Phase I has a designed daily waste processing capacity of 700 tonnes (255,500 tonnes per year) and will have 2 x 350 tonn

Status
Prospective
Sector
Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial)
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Meizhou Wuhua Waste-to-energy Plant Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Meizhou Wuhua Waste-to-energy Plant Phase I” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the investment, construction and operation of the phase I of Meizhou Wuhua Waste-to-energy plant, located in Wuhua, Guangdong Province, China. The project will be constructed in 2 phases with a total designed daily waste processing capacity of 1,050 tonnes. Phase I has a designed daily waste processing capacity of 700 tonnes (255,500 tonnes per year) and will have 2 x 350 tonnes/day grate furnaces and 1 x 18MW turbine power generator. The project will be constructed on a PPP basis for a concession period of 30 years, which includes the construction period. The sponsor is China Everbright International Ltd. The phase I project cost is CNY 468 million ($ 66.53 million). Financial close was reached on 7 August 2019. Upon completion the plant is expected to generate approximately 84 million kWh annually. https://www.ebchinaintl.com/en/media/news_content-p190807.html

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project