logo

Melawa Power Plant

Sector: Commercial • Location: Sabah, Malaysia

Source: World Bank Group

Project
Active

ARL Tenaga was awarded the contract to build, own and operate a 50-MW power plant located adjacent to the existing Melawa Power station that belongs to the state-owned company Sabah Electricity Sdn Bhd (SESB). The power plant comprises four diesel units with 12.5 MW each. The contract was awarded in Sep. 1993, but works only started in Sep. 1994. The first unit commenced commercial operations in O

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government
Location
Sabah, Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Melawa Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Melawa Power Plant” is an infrastructure initiative in the Commercial sector, located in Sabah, Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ARL Tenaga was awarded the contract to build, own and operate a 50-MW power plant located adjacent to the existing Melawa Power station that belongs to the state-owned company Sabah Electricity Sdn Bhd (SESB). The power plant comprises four diesel units with 12.5 MW each. The contract was awarded in Sep. 1993, but works only started in Sep. 1994. The first unit commenced commercial operations in Oct. 1995 and the other units started supplying electricity in Apr. 1996. ARL. Tenaga has a 21-year power purchase agreement with SESB starting in Jun. 1994. The project company is a subsidiary of ARL Associates, which is wholly-owned by the Bumiputra Group. None None

Original sector

Energy

Budget

Location

Country

Malaysia

State

Sabah

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project