logo

Melbourne NE Link

Sector: Airport • Location: Melbourne, Australia

Source: Highways Today

Project
Ongoing

The North East Link will be the biggest transport project in Victoria’s history, finally building the missing link in Melbourne’s freeway network. The link will begin on the Eastern Freeway at Springvale Road where the capacity of the Eastern will be doubled with six extra dedicated lanes to eliminate some of eastern Melbourne’s worst bottlenecks. The expanded Eastern Freeway section will remain t

Project Information FAQ

Project Information

5 Q
The project “Melbourne NE Link” is an infrastructure initiative in the Airport sector, located in Melbourne, Australia. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The North East Link will be the biggest transport project in Victoria’s history, finally building the missing link in Melbourne’s freeway network. The link will begin on the Eastern Freeway at Springvale Road where the capacity of the Eastern will be doubled with six extra dedicated lanes to eliminate some of eastern Melbourne’s worst bottlenecks. The expanded Eastern Freeway section will remain toll-free. Heading west, the mega-freeway will connect to a new six-lane tunnel at Bulleen with local underground connections at Banksia St and Manningham Road. The five-kilometer-long tunnel will then travel deep beneath the Yarra River, protecting environmentally sensitive parkland and residential areas. There will be a local connection at Lower Plenty Road, with the North East Link then running north alongside the existing Greensborough Highway, which will stay open for local traffic. A new interchange will see the North East Link travel beneath Grimshaw Street in Watsonia, before seamlessly connecting to the M80 Ring Road at Greensborough, which is also being widened. Travel times between Melbourne’s north and south will be cut by up to 30 minutes in each direction, with massive travel time savings for people traveling to Melbourne Airport from the south and east. Congestion on local roads in the northeastern suburbs will also be slashed, with up to 15,000 trucks taken off local streets a day, and more than 9,000 vehicles taken off hotspots like Rosanna Road. While the business case is yet to be finalized, early cost estimates of this massive project range up to $16.5 billion – the single biggest transport infrastructure investment in Victorian history. The project is expected to create around 10,000 Victorian jobs. Detailed design will now get underway and the business case, including finalizing cost estimates, will be publicly released ahead of the Victorian Budget 2018/19. Procurement and planning approval processes will also begin in 2018, ahead of a preferred builder being selected in 2019, and major construction starting in 2020.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data