Melbourne’s CityLink PPP
Sector: Airport • Location: Australia
Source: InfraPPPWorld
The 22 kilometre roadway that is CityLink is comprised of the Western Link and the Southern Link.The Western Link is made up of an upgrade to the Tullamarine Freeway between Bulla Road and Flemington Road (now eight lanes), a six lane elevated road through West Melbourne and a connecting bridge over the Yarra River to the West Gate Freeway.The Southern Link comprises two three-lane tunnels, the Bu
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | project in operation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The 22 kilometre roadway that is CityLink is comprised of the Western Link and the Southern Link.The Western Link is made up of an upgrade to the Tullamarine Freeway between Bulla Road and Flemington Road (now eight lanes), a six lane elevated road through West Melbourne and a connecting bridge over the Yarra River to the West Gate Freeway.The Southern Link comprises two three-lane tunnels, the Burnley and the Domain Tunnels (3.4 kilometres and 1.6 kilometres long, respectively) which run underneath the Yarra River, and an upgrade to the previous freeway (now five and six lanes) between the city and the city-end of the Monash Freeway, near Toorak Road.A variation of the agreement introduced in April 2015 will add extra lanes in each direction between the Bolte Bridge and Melbourne Airport, as well as extra lanes on the Bolte Bridge and a section of the West Gate Freeway (eastbound) between Bolte Bridge and Power Street. It also add a Freeway Management System. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
