logo
ProjectProject In Operation

Melbourne’s CityLink PPP

Project in operation · Australia

Source: InfraPPPWorld

The 22 kilometre roadway that is CityLink is comprised of the Western Link and the Southern Link.The Western Link is made up of an upgrade to the Tullamarine Freeway between Bulla Road and Flemington Road (now eight lanes), a six lane elevated road through West Melbourne and a connecting bridge over the Yarra River to the West Gate Freeway.The Southern Link comprises two three-lane tunnels, the Bu

Status
Under Construction
Sector
Bridge, Power Generation (CCGT), Airport, Road
Location
Australia
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Melbourne’s CityLink PPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Melbourne’s CityLink PPP” is an infrastructure initiative in the Bridge sector, located in Australia. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Not available for this record.

Status

Original status

project in operation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 22 kilometre roadway that is CityLink is comprised of the Western Link and the Southern Link.The Western Link is made up of an upgrade to the Tullamarine Freeway between Bulla Road and Flemington Road (now eight lanes), a six lane elevated road through West Melbourne and a connecting bridge over the Yarra River to the West Gate Freeway.The Southern Link comprises two three-lane tunnels, the Burnley and the Domain Tunnels (3.4 kilometres and 1.6 kilometres long, respectively) which run underneath the Yarra River, and an upgrade to the previous freeway (now five and six lanes) between the city and the city-end of the Monash Freeway, near Toorak Road.A variation of the agreement introduced in April 2015 will add extra lanes in each direction between the Bolte Bridge and Melbourne Airport, as well as extra lanes on the Bolte Bridge and a section of the West Gate Freeway (eastbound) between Bolte Bridge and Power Street. It also add a Freeway Management System.

Original sector

Transport

Procurement method

Budget

Location

Country

Australia

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Bridge, Power Generation (CCGT), Airport, Road

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project