logo

Melendy Road Bridge Replacement

Sector: Water Supply and Storage • Location: Hudson, New Hampshire, United States of America

Source: Dodge USA

Project
Closed

For melendy road bridge rehabilitation--melendy road overfirst brook (114/083) bridge replacement. SCOPE OF SERVICES The work will involve the following: Mobilization Establish traffic control plan Install temporary erosion control measures Install water diversion structure Demolish existing bridge Excavate for proposed rigid frame Install rigid frame footing and stem wall Reconstruct wingwalls ut

Status
Closed
Sector
Water Supply and Storage, Commercial, Power Transmission, Bridge, Road, Government, Power Generation (CCGT)
Location
Hudson, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Melendy Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Melendy Road Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Hudson, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For melendy road bridge rehabilitation--melendy road overfirst brook (114/083) bridge replacement. SCOPE OF SERVICES The work will involve the following: Mobilization Establish traffic control plan Install temporary erosion control measures Install water diversion structure Demolish existing bridge Excavate for proposed rigid frame Install rigid frame footing and stem wall Reconstruct wingwalls utilizing existing abutment stones Install proposed rigid frame Regrade streambed Relocate undergro...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Hudson

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Transmission, Bridge, Road, Government, Power Generation (CCGT)

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project