Melrose Leadership Academy at Maxwell Site Improvement
Sector: Water Supply and Storage • Location: Oakland, California, United States of America
Source: Dodge
The contractor will demolish the existing play structure, basketball hoop, safety surfacing, and planter beds. Contractor to install safety surfacing tiles for new play structure. The new play structure will be installed by others. Additional work includes tree planting with irrigation and drainage and applying a double layer of seal coating on existing pavement, and expansion of the garden area.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Oakland, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Melrose Leadership Academy at Maxwell Site Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor will demolish the existing play structure, basketball hoop, safety surfacing, and planter beds. Contractor to install safety surfacing tiles for new play structure. The new play structure will be installed by others. Additional work includes tree planting with irrigation and drainage and applying a double layer of seal coating on existing pavement, and expansion of the garden area. Work will follow strict safety standards and coordination with OUSD. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oakland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
