logo

MEMC Soutpan Solar Plant

Sector: Car parking • Location: South Africa

Source: World Bank Group

Project
Active

The Soutpan Solar Park, a 28 MW solar PV facility, was under development by the US-based solar company Sunedison. Sponsors of the project included Sunedison, backed by MEMC materials (51%) and an array of local South Africa businesses (49%). The project company was: Erika Energy (Pty) Lt. Shareholders in the holding company were CHINT / ASK & MEMC. Astroenergy Solar Korea (ASK) was a wholly owne

Status
Prospective
Sector
Car parking, Power Generation (CCGT), Power Transmission, Solar, Government, Automotive, Commercial
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MEMC Soutpan Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MEMC Soutpan Solar Plant” is an infrastructure initiative in the Car parking sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Soutpan Solar Park, a 28 MW solar PV facility, was under development by the US-based solar company Sunedison. Sponsors of the project included Sunedison, backed by MEMC materials (51%) and an array of local South Africa businesses (49%). The project company was: Erika Energy (Pty) Lt. Shareholders in the holding company were CHINT / ASK & MEMC. Astroenergy Solar Korea (ASK) was a wholly owned subsidiary of CHINT Solar (Zheijiang), of CHINT Groep. SunEdison was bought by MEMC in 2009. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012, but it was predicted that there would be a 20 year PPA with the state owned utility, Eskom. Construction was expected to start in December 2012. The project was to connect to the Soutpan substation. EPC partner was Izingwe Capital. O&M partner was Landelahni investments. Management services provider was SunEdison Energy Southern Africa Total estimated project cost was ZAR 1.4 billion (USD 184.7 million), with commissioning expected for 2013. Financial closure was expected in June 2012. This power plant commenced its operation in January 2014. Coordinates were: 22° 59.5’ S , 29° 15.1’ E. http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Soutpan%20Solar%20Park%20(Erika%20Energy)(%20Pty)%20Ltd.pdf http://www.pv-tech.org/news/consortiums_150mw_projects_awarded_preferred_bidder_status_by_south_african http://plak.co.za/moreinfo.php?id=4109

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Car parking, Power Generation (CCGT), Power Transmission, Solar, Government, Automotive, Commercial

Article published date

2024-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project