Memorial Fieldhouse Wrestling & Tennis Suites REBID
Bid results · Wyoming · Last reported Oct 2024
Source: Dodge USA
All labor and materials for a remodel of existing space including, but not limited to, interior finishes, mechanical, and electrical scope. architectural and engineering design and construction administration to meet the buildout requirements from existing spaces within a nonsprinkled type II-B building. The existing spaces are rooms 231 and 273, located on the second floor west wing of the Memori
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Road, Education, Government
- Location
- Laramie, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Memorial Fieldhouse Wrestling & Tennis Suites REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | All labor and materials for a remodel of existing space including, but not limited to, interior finishes, mechanical, and electrical scope. architectural and engineering design and construction administration to meet the buildout requirements from existing spaces within a nonsprinkled type II-B building. The existing spaces are rooms 231 and 273, located on the second floor west wing of the Memorial Fieldhouse, located on the University of Wyoming Campus in Laramie, Wyoming. Scope includes de... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Laramie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Road, Education, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
