logo
ProjectHold

Menema

One of 1,247 projects Taiyo tracks in Guinea.

Source: International Finance Corporation (IFC)

 The proposed investment is a debt investment of EUR9.2 million split between IFC A Loan and IDA-PSW to support the expansion of Menema Guinée (“Menema” or “the Company”), a company operating in Guinea that produces mattresses, plastic consumer goods, and wooden furniture. Menema has an existing facility, covering an area of 10288,21 square meters, located in the agro-industrial area of Meneah in

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Government
Location
Guinea
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Menema

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Menema” is an infrastructure initiative in the Water Supply and Storage sector, located in Guinea. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

hold

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed investment is a debt investment of EUR9.2 million split between IFC A Loan and IDA-PSW to support the expansion of Menema Guinée (“Menema” or “the Company”), a company operating in Guinea that produces mattresses, plastic consumer goods, and wooden furniture. Menema has an existing facility, covering an area of 10288,21 square meters, located in the agro-industrial area of Meneah in the district of Coyah. The key operations at the current facilities include production of mattresses and plastic consumer goods using injection moulding. The proposed investment from IFC (“the Project”) will finance (a) the expansion of the current facility, which will be dedicated exclusively to the production of plastic consumer goods, through acquisition of new equipment and materials; and (b) a greenfield mattress facility and showroom, in Kassognah, about 20 km from Meneah, with the goal of doubling the current mattress production capacity. The site is a vacant plot of 10,000 Sq m and which was purchased by Menema in 2011 on a Willing Buyer Willing Seller basis. The site is located in a semi-urban area and the nearest sensitive ecosystem eg mangrove forest is located about 5 km away from the project site.

Original sector

other

Location

Country

Guinea

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project