MEPSO - Transmission grid strengthening
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering providing a senior unsecured loan of up to € 26.4 million to the Macedonian Transmission System Operator AD ("MEPSO", or the "Company"). The proceeds of the EBRD financing will be used to finance the construction of (i) 400/110kV substation near Miletkovo, (ii) new 110kv OHTL connection and rehabilitation of the existing 110kV overhead transmission lines and substations in
- Status
- Under Construction
- Sector
- Road, Power Generation (CCGT), Residential, Waste Processing and Treatment, Power Transmission, Commercial, Government
- Location
- Macedonia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about MEPSO - Transmission grid strengthening
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The EBRD is considering providing a senior unsecured loan of up to € 26.4 million to the Macedonian Transmission System Operator AD ("MEPSO", or the "Company"). The proceeds of the EBRD financing will be used to finance the construction of (i) 400/110kV substation near Miletkovo, (ii) new 110kv OHTL connection and rehabilitation of the existing 110kV overhead transmission lines and substations in and between Miletkovo, Valando and Strumica, and (iii) develop a training center for high voltage grid operators and other sectoral specialists (the "Project"). The Project will also benefit from (i) € 7.8 million investment grant from the Western Balkans Investment Fund (WBIF) and € 0.5 million grant from the Climate Investment Fund Accelerating Coal Transition ("CIF ACT"). The total project cost will be € 34.7 million. |
Original sector | Energy |
Budget |
Location
Country | Macedonia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Residential, Waste Processing and Treatment, Power Transmission, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in North Macedonia
- FYROM - ROADS II
- CORRIDOR X ROAD PROJECT
- FYROM ROADS
- Smokovac - Kolasin - Matesevo Section (Phase I), Bar - Boljare Motorway
- Kicevo-Ohrid Highway
- Mapping of cultural heritage in the municipalities of Strumyani and Karbincii and stimulation of the development cultural tourism through integrated tourist products
- ABOVE
- Development of Border Infrastructure between Greece and the former Yugoslav Republic of Macedonia
