logo
ProjectSigned

MEPSO - Transmission grid strengthening

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

The EBRD is considering providing a senior unsecured loan of up to € 26.4 million to the Macedonian Transmission System Operator AD ("MEPSO", or the "Company"). The proceeds of the EBRD financing will be used to finance the construction of (i) 400/110kV substation near Miletkovo, (ii) new 110kv OHTL connection and rehabilitation of the existing 110kV overhead transmission lines and substations in

Status
Under Construction
Sector
Road, Power Generation (CCGT), Residential, Waste Processing and Treatment, Power Transmission, Commercial, Government
Location
Macedonia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about MEPSO - Transmission grid strengthening

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MEPSO - Transmission grid strengthening” is an infrastructure initiative in the Road sector, located in North Macedonia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The EBRD is considering providing a senior unsecured loan of up to € 26.4 million to the Macedonian Transmission System Operator AD ("MEPSO", or the "Company"). The proceeds of the EBRD financing will be used to finance the construction of (i) 400/110kV substation near Miletkovo, (ii) new 110kv OHTL connection and rehabilitation of the existing 110kV overhead transmission lines and substations in and between Miletkovo, Valando and Strumica, and (iii) develop a training center for high voltage grid operators and other sectoral specialists (the "Project"). The Project will also benefit from (i) € 7.8 million investment grant from the Western Balkans Investment Fund (WBIF) and € 0.5 million grant from the Climate Investment Fund Accelerating Coal Transition ("CIF ACT"). The total project cost will be € 34.7 million.

Original sector

Energy

Budget

Location

Country

Macedonia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Residential, Waste Processing and Treatment, Power Transmission, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project