Repaying

EBRD will provide a senior corporate loan of up to EUR 40 million to MEPSO, the national electricity transmission company, to fund the Macedonian component of the Macedonian-Albania Transmission line. The Macedonian Transmission System Operator AD MEPSO (“MEPSO”, “Company” or “Borrower”) is the  100% state-owned electricity transmission system operator of FYR Macedonia (“Country”), and was establi

Project Information FAQ

Project Information

4 Q
The project “MEPSO: FYR Macedonia-Albania Transmission Phase I” is an infrastructure initiative in the Power Generation (CCGT) sector. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

EBRD will provide a senior corporate loan of up to EUR 40 million to MEPSO, the national electricity transmission company, to fund the Macedonian component of the Macedonian-Albania Transmission line. The Macedonian Transmission System Operator AD MEPSO (“MEPSO”, “Company” or “Borrower”) is the  100% state-owned electricity transmission system operator of FYR Macedonia (“Country”), and was established as an independent transmission system operator (“TSO”) in 2005. The project entails (i) the construction of electricity transmission infrastructure from Bitola to the Albanian border, with a substation at Ohrid and (ii) the introduction of Smart Grid components in MEPSO (the “Project”). By providing the Macedonian side of the first interconnection between FYR Macedonia and Albania, the Project provides the missing link in the initiative to establish an East – West electricity transmission corridor between Bulgaria, FYR Macedonia, Albania, Montenegro and Italy.  The section between Bulgaria and FYR Macedonia (OpID 27768) has been completed. Albania and Montenegro are connected through a new 400kV line and the construction of the submarine cable between Italy and Montenegro is underway, supported in Montenegro through the Lastva – Plejvlja Transmission Line Project (OPID 42768). There is a Project Summary Document available for this project Non-Technical Summary (NTS) of the CCGT: Macedonian | English Stakeholder Engagement Plan (SEP) of the CCGT: Macedonian | English Environmental and Social Impact Assessment (ESIA) : Macedonian | English Land Acquisition and Compensation Framework:  Macedonian | English Environmental and Social Action Plan (ESAP): Macedonian | English Full ESIA documentation is available locally at: The ESIA package and Executive Summary will also be released for public review by the project sponsor on its website: Jordan Angelovski, M.Sc.Eng. Head International Cooperation and International Financial Institutions AD MEPSO Maksim Gorki 4, 1000 Skopje, Republic of Macedonia Phone/тел: +389 (0)2 31 49 046 Fax/факс: +389 (0)2  31 11 160 e-mail: jordan.angelovski@mepso.com.mk

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data