MEPSO: FYR Macedonia-Albania Transmission Phase I
Sector: Power Generation (CCGT)
Source: European Bank for Reconstruction and Development (EBRD)
EBRD will provide a senior corporate loan of up to EUR 40 million to MEPSO, the national electricity transmission company, to fund the Macedonian component of the Macedonian-Albania Transmission line. The Macedonian Transmission System Operator AD MEPSO (“MEPSO”, “Company” or “Borrower”) is the 100% state-owned electricity transmission system operator of FYR Macedonia (“Country”), and was establi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | repaying |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | EBRD will provide a senior corporate loan of up to EUR 40 million to MEPSO, the national electricity transmission company, to fund the Macedonian component of the Macedonian-Albania Transmission line. The Macedonian Transmission System Operator AD MEPSO (“MEPSO”, “Company” or “Borrower”) is the 100% state-owned electricity transmission system operator of FYR Macedonia (“Country”), and was established as an independent transmission system operator (“TSO”) in 2005. The project entails (i) the construction of electricity transmission infrastructure from Bitola to the Albanian border, with a substation at Ohrid and (ii) the introduction of Smart Grid components in MEPSO (the “Project”). By providing the Macedonian side of the first interconnection between FYR Macedonia and Albania, the Project provides the missing link in the initiative to establish an East – West electricity transmission corridor between Bulgaria, FYR Macedonia, Albania, Montenegro and Italy. The section between Bulgaria and FYR Macedonia (OpID 27768) has been completed. Albania and Montenegro are connected through a new 400kV line and the construction of the submarine cable between Italy and Montenegro is underway, supported in Montenegro through the Lastva – Plejvlja Transmission Line Project (OPID 42768). There is a Project Summary Document available for this project Non-Technical Summary (NTS) of the CCGT: Macedonian | English Stakeholder Engagement Plan (SEP) of the CCGT: Macedonian | English Environmental and Social Impact Assessment (ESIA) : Macedonian | English Land Acquisition and Compensation Framework: Macedonian | English Environmental and Social Action Plan (ESAP): Macedonian | English Full ESIA documentation is available locally at: The ESIA package and Executive Summary will also be released for public review by the project sponsor on its website: Jordan Angelovski, M.Sc.Eng. Head International Cooperation and International Financial Institutions AD MEPSO Maksim Gorki 4, 1000 Skopje, Republic of Macedonia Phone/тел: +389 (0)2 31 49 046 Fax/факс: +389 (0)2 31 11 160 e-mail: jordan.angelovski@mepso.com.mk |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
