MEPSO Rehabilitation and Control Project
Sector: Nuclear • Location: North Macedonia
Source: European Bank for Reconstruction and Development (EBRD)
Translated version of this PSD: Macedonian The EBRD is considering providing a senior corporate loan to MEPSO, the state-owned electricity transmission system operator in FYR Macedonia. The proceeds of the loan will contribute to the following components of MEPSO’s medium term development plan: The EBRD loan will be the first non-sovereign guaranteed loan to a public energy company in FYR Macedoni
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | repaying |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Translated version of this PSD: Macedonian The EBRD is considering providing a senior corporate loan to MEPSO, the state-owned electricity transmission system operator in FYR Macedonia. The proceeds of the loan will contribute to the following components of MEPSO’s medium term development plan: The EBRD loan will be the first non-sovereign guaranteed loan to a public energy company in FYR Macedonia. The use of a corporate loan will provide a demonstration effect to both domestic and foreign financiers of ways and instruments to finance activities. It will spread behaviour and attitudes that enhance the legitimacy and functioning of the market economy. The project will also begin MEPSO’s transformation towards remotely supervised and controlled substations. This will lead to the reduction or even elimination of outages, increased physical security of the assets, and productivity improvements. This aspect of the project will provide a demonstration effect of products and processes that are new to the economy. MEPSO, the 100% state-owned electricity transmission system operator (TSO) of FYR Macedonia, was incorporated as an independent TSO in 2005, when the old vertically integrated state-owned utility ESM was unbundled into 3 major companies. MEPSO’s business activity is: (i) transmission of electricity; (ii) management of the electric power system by dispatching electricity throughout the country, as well as balancing the power system; and (iii) organisation and management of the Macedonian electricity market. MEPSO is responsible for transmission from the Macedonian border to large industrial customers or to the low voltage grid of EVN AD Macedonia, the privatised national distribution operator. Senior corporate loan of up to EUR 25 million. Estimated at EUR 40.5 million. Category B, with potential environmental and social impacts readily identified and mitigated. Environmental and social due diligence is underway, and will be completed with the assistance of an independent consultant. Preliminary information suggests there is limited potential for environmental impacts caused by the Project since most or all activities will involve reconstruction or replacement of existing assets and will not disturb new ground. It appears that most environmental impacts would be associated with construction activities and could be avoided or adequately controlled by the application of best practices to control erosion, noise, and other disturbances. This will be evaluated during due diligence. Since the line was constructed in the 1960s, occupied houses and other buildings have encroached on the 110kV transmission line corridor. Along several kilometres of the line to be replaced by the Project, houses are closer to the energized lines than allowed by Macedonian norms, which require five meters of horizontal clearance and six meters vertically. Due diligence will determine whether there are legal or safety reasons that would justify adjusting the corridor or taking other steps to protect the buffer zone. If determined to be necessary, actions will be required to ensure no one is exposed to health risks by exposure to electromagnetic radiation or safety risks from fallen lines. A Stakeholder Engagement Plan will guide MEPSO’s disclosure of relevant Project information and subsequent engagement with stakeholders, and an Environmental and Social Action Plan will be developed to ensure the Project will be completed in compliance with the Bank’s Performance Requirements. This Summary will be updated when due diligence is complete, before the Project is considered for approval. None. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
