logo

Merced Pavement Anchor Project

Sector: Bridge • Location: Merced, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Ready To List

The California Department of Transportation (Caltrans) proposes to perform roadway improvements along State Route 59, between post mile R0.0 and post mile R12.1 in Merced County. The existing pavement has deteriorated, resulting in poor ride quality and requiring elevated maintenance efforts. A cold plane and overlay strategy will be used to preserve the pavement. The scope of work for the project

Project Information FAQ

Project Information

5 Q
The project “Merced Pavement Anchor Project” is an infrastructure initiative in the Bridge sector, located in Merced, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ready to list

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The California Department of Transportation (Caltrans) proposes to perform roadway improvements along State Route 59, between post mile R0.0 and post mile R12.1 in Merced County. The existing pavement has deteriorated, resulting in poor ride quality and requiring elevated maintenance efforts. A cold plane and overlay strategy will be used to preserve the pavement. The scope of work for the project will include repairing and replacing the existing pavement and replacing identified damaged culverts and end treatments. There are four bridges within the project area. Three of the bridges—Owens Creek Bridge, Miles Creek Bridge, and Deadman Creek Bridge—will require barrier and block extensions, replacement of existing metal beam guardrails to the Midwest Guardrail System, and replacement of nonstandard end treatments and terminal systems. The fourth bridge, Mariposa Creek Bridge, will be removed and replaced with a higher bridge to eliminate the continuous flooding that occurs at this location.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data