Merck Innovation Center, Darmstadt
Sector: Car parking • Location: Germany
Source: Pharmaceutical Technology
Merck KGaA’s innovation centre at its global headquarters in Darmstadt was built as a part of a €1bn ($1.12bn) strategic initiative. New innovation centre Darmstadt, Germany October 2015 March 2018 May 2018 Merck €69m ($77.3m) 21,950m² Henn Architekten Bollinger + Grohmann Ingenieure, ZWP Ingenieure, Topotek 1, Müller-BBM, Emmer Pfenninger, Lumen³, Ed. Züblin, Durlum Merck KGaA’s innovation centre
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Merck KGaA’s innovation centre at its global headquarters in Darmstadt was built as a part of a €1bn ($1.12bn) strategic initiative. New innovation centre Darmstadt, Germany October 2015 March 2018 May 2018 Merck €69m ($77.3m) 21,950m² Henn Architekten Bollinger + Grohmann Ingenieure, ZWP Ingenieure, Topotek 1, Müller-BBM, Emmer Pfenninger, Lumen³, Ed. Züblin, Durlum Merck KGaA’s innovation centre at its global headquarters in Darmstadt was built as a part of a €1bn ($1.12bn) strategic initiative. The initiative aimed to transform Merck’s existing operations inDarmstadtinto the company’s global headquarters. The new innovation centre performs research for new products and develops ways to implement co-operative projects. A groundbreaking ceremony for the €69m ($77.3m) innovation centre took place in October 2015. The project was completed in March 2018 and inaugurated in May. The new innovation centre was developed between Merck’s existing facilities in Darmstadt. As a precursor to the facility, Merck opened a modularinnovationcentre in 2015 at a cost of €17m ($19m). This modular centre provided a base for designing the functions of the new one. The centre contains work spaces for creation of visionary products and services meant for the future. Some of these include indoor farming and 3D printing of medicines. The centre’s design also helped test new work environments, technologies, processes and work cultures, which promoted innovation. Outcomes of the test were implemented in the final innovation centre. Following the new centre’s completion, the modular centre was converted into a visitor area. An open and transparent design was chosen for the new building to symbolise innovation, flexibility, and openness, while promoting communication and creativity. The new centre comprises five levels and occupies a total area of 21,950m² with 7,100m2 floor space. The ground level of the building includes the entrance area, a cafeteria and an auditorium. The first floor consists of open, flexible and secluded workspaces in various spatial concepts. Secluded workspaces are available for phone calls and focused work, while informal and flexible spaces with retreat areas and bean bags are available for brief team meetings. A library is also available. Floors two to four include open and transparent rooms to promote a casual and collaborative work environment. A workshop for the development of prototypes is available on the fifth floor alongside social spaces and cushioned seating areas are available. All floors of the building are connected by ramps and stairs. Stage areas between the project areas of each floor are available for use as needed. A three-level employee cafeteria building adjoins the main building, providing food court style offerings. The second floor of the cafeteria serves Asian, Mediterranean and vegan cuisine while the ground floor features bakery, beverage and promotion stores. Seating areas are located along a façade. The innovation centre’s design was developed by Henn Architekten. Other partners included Bollinger + Grohmann Ingenieure, ZWP Ingenieure, Topotek 1, Müller-BBM, Emmer Pfenninger and Lumen. Ed Züblin was responsible for the structural work of the employee cafeteria and the centre’s reinforced concreteconstruction. The metal ceiling was supplied by Durlum. Merck’s initiative aims to establish Darmstadt as the company’s main site by 2020. Development of the innovation centre and employee cafeteria form the main part of the initiative. Merck has already completed the development of a parking garage and two energy stations. Other projects planned under the initiative include a pharmaceutical packaging facility, an organic light-emitting diode (OLED) production building and a pharmaceutical laboratory. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Car parking projects in Germany
- Knapsack II Combined Cycle Gas Fired Power Plant
- TrammGthen Solar Park MecklenburgWestern Pomerania Germany
- FLUGHAFEN HANNOVER
- FLUGHAFEN KOLN/BONN
- VILLE DES SCIENCES HOECHST
- Muenster Adaptive Signal Control System
- Munich Automated Underground Parking System
- Glycotope Biotechnology Antibody Production Facility
