Mercur Gold Project Drilling Program 2025
One of 10,000+ projects Taiyo tracks in Utah.
Source: The Globe and Mail
The 2025 drilling program at the Mercur Gold Project in Utah involved 115 RC and core holes completed, targeting low grade disseminated mineralization and testing structural controls below design pits. The program revealed high-grade gold intercepts, highlighting exploration potential and supporting a planned Pre-Feasibility Study for restarting gold production.
- Status
- Prospective
- Sector
- Mining
- Location
- Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- The Globe and Mail
ConstructChat
Ask ConstructChat about Mercur Gold Project Drilling Program 2025
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under exploration |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2025 drilling program at the Mercur Gold Project in Utah involved 115 RC and core holes completed, targeting low grade disseminated mineralization and testing structural controls below design pits. The program revealed high-grade gold intercepts, highlighting exploration potential and supporting a planned Pre-Feasibility Study for restarting gold production. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Utah |
Source
Source | The Globe and Mail |
URL |
More Details
Record type | Project |
Article published date | 2026-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
